Bowles Mattress: a hundred-year-old factory, redecked from the rafters up.
A working factory with leaks in one section and a replacement they were not ready for. So we ran repairs for six months, and when they chose us for the replacement, every repair dollar was credited back. The deck turned out to be gone, so we craned plywood up and redecked the entire building before the first shingle went on.
- Building
- Century-old mattress factory, in production through the project
- Approach
- Six months of repairs first, credited in full against the replacement
- Structure
- New wood decking across the entire building, plywood craned to the roof
- Shingle
- Owens Corning Duration, Brownwood
- Detail
- Transition into the metal section that had leaked since the day it was built, with follow-up repairs on the metal
The deck was gone
You do not find this out from the ground. We found it on the first tear-off day and redecked the building instead of shingling over it.
Repairs, deck, shingle, done
Factory roof leaking and a replacement not in the budget yet?
Repairs now, credited against the replacement later. Send Jon the address and he’ll walk it, free.
Jon Hainline
Commercial Division Manager, Redemption Solar & Roofing
Duro-Last contractor. Owens Corning Platinum Preferred Contractor. GAF Gold Elite Commercial Contractor.